Efficiency

In Unlu Tekstil, business plans (operations) and their standard duration are determined before the models enter production. Within these periods, finishing the operations and model is targeted and this is monitored. Instant yield is calculated by proportioning the determined time and realized time. Thus bottlenecks in production are followed and it is ensured that model is finished on the target date.

In addition, loss of time and bottlenecks are prevented by following all processes from purchase orders to fabric entry, from cutting to packaging. Thanks to these two systems, it is aimed to deliver our orders on time.